We got some more work done on the table. The fields are 95% done. Just touch up in a few spots. On Tuesday we got the villages put back on the board. Glued the buildings in place and let them set up for the night. I might do some paint touch up on the buildings, but we'll see if I have time for that. Just something that my bothers my OCD, not anything wrong with them.
We also started in on replacing hedgerows. Anyway here's some pics.
Fields done
Villages added back on
Touched up buildings
Really coming together now
The big one is Rivoli
These damn Hi-res cameras show all the flaws
Making Hedgerows
Yarn, sprayed with glue
Roll yarn in your flock of choice
Waiting for Alan to glue in place as I crank out more strips
Trim to fit
Looks pretty good once the glue drys.
So we need to finish the board by Tuesday so everything has time to dry. It's mostly done, but those hedgerows take time. Anyway we are in good shape. If your going to Cold Wars, stop by and say hi.
Xin / Jeff
Test pic
Showing posts with label 10mm. Show all posts
Showing posts with label 10mm. Show all posts
Monday, March 11, 2019
Monday, March 4, 2019
Fixing up Rivoli
My friends Alan and Bob are running a Napoleonic game at Cold Wars 2019. I will be running Frostgrave Ghost Archipelago. The Nap game will be The Battle of Rivoli. We ran this game before at Fall In 2015.

It's in pretty good shape
Some fields have bare spots where the flock wore off.
The biggest issue is mold on some of the hedgerows
We used Lichen for the river bank and some parts of the hedgerows. That all has to be removed.
With paint, glue and time, the soft lichen is harder than rock. We had to chip it off.
In some spots we used a dremel.
Not bad looking after clean up
At some point we decided to redo ALL the hedgerows. During the removal process huge divots were dug into the boards. We filled them with spackle, then painted them our base brown color.
We had to touch up a lot of spots.
What was a simple clean up has become a major project, more supplies needed.
Damage was done to the roads too, so then need fixing. I need small "Men at Work" signs
Re-flocking the fields
Hmmm lots more fields to fix.
Starting to come together.
Don't have the pics, but most of the fields are fixed. Next we put all the buildings on. And last step is all the hedgerows.
A week out and I've been in much worse shape on previous builds. We got this.
Xin
Part 2

We pulled the board out of storage.
Some fields have bare spots where the flock wore off.
The biggest issue is mold on some of the hedgerows
We used Lichen for the river bank and some parts of the hedgerows. That all has to be removed.
With paint, glue and time, the soft lichen is harder than rock. We had to chip it off.
In some spots we used a dremel.
Not bad looking after clean up
At some point we decided to redo ALL the hedgerows. During the removal process huge divots were dug into the boards. We filled them with spackle, then painted them our base brown color.
We had to touch up a lot of spots.
What was a simple clean up has become a major project, more supplies needed.
Damage was done to the roads too, so then need fixing. I need small "Men at Work" signs
Re-flocking the fields
Hmmm lots more fields to fix.
Starting to come together.
Don't have the pics, but most of the fields are fixed. Next we put all the buildings on. And last step is all the hedgerows.
A week out and I've been in much worse shape on previous builds. We got this.
Xin
Part 2
Subscribe to:
Posts (Atom)































